If your van build has an electrical plan, run an electrical plan audit before you buy parts or book help. A quick audit finds hidden costs, prevents undersized wiring and fuses, and shows whether a job is worth DIY time or better done by a pro.
Why do an electrical plan audit?
An electrical plan audit catches cost leaks before they happen. It clarifies what parts you truly need, flags wiring and protection upgrades, and helps you decide between DIY hours and paid labour. A small upfront check often saves hundreds or more.
How to run an electrical plan audit
- Start with a clean component list: batteries, inverter, charger, solar panels, MPPT, shore/alternator inputs, loads (fridge, heater, pump, lights, inverters), and accessories.
- Count real quantities and note model numbers. Replace vague lines like “lights” with “8 LEDs @ 3 W each, 12 V” so current draws are clear.
- Estimate hours: for each item, write DIY hours and pro hours. Be honest about skills: wiring through walls, crimping, and testing take longer than placing parts.
- Add labour cost: multiply pro hours by a local hourly rate and DIY hours by what you’d pay a helper or the value of your time.
- Size fuses and wire runs: calculate expected continuous current and choose fuse and wire ampacity with the right safety margin (see table).
- Check mounting, connectors, and extras: brackets, insulated terminals, conduit, breakers, busbars, and cable glands add cost and time.
- Add a contingency buffer of 10–20% for small projects, 20–35% for complex systems with alternator charging or hybrid setups.
Quick calculations: labour, parts, and fuse sizing
Use these quick formulas to turn the plan into numbers you can add into a budget or a Van Heda project.
| Item | What to check | Quick calc | Red flag / cost signal |
|---|---|---|---|
| Continuous current | Sum the steady draws on the same circuit (A) | Watts ÷ Voltage, then add devices | If >70% of fuse rating, increase wire gauge or split circuit |
| Fuse sizing | Match continuous current × 1.25 for continuous loads | Fuse = round up to next common fuse | Frequent fuse changes or large starting currents indicate need for redesign |
| Wire gauge | Select wire ampacity ≥ expected current at 70–80% of rated ampacity | Cross-check with fuse size and run length | Long runs needing much larger gauge mean more copper cost |
| Labour estimate | DIY hours × your hourly value vs pro hours × local rate | Compare totals | If pro cost < value of your time or schedule loss, hire help
Four common mistakes that blow budgets — and how to fix them
- Undersized wiring or fuses. Problem: short-term fit looks cheap but forces replacements and safety risks. Fix: recalc continuous current, apply 125% rule for continuous loads, and pick the wire gauge for the full run length.
- Ignoring starting currents. Problem: fridges, pumps, and compressors draw many times steady current on start and can trip undersized protection. Fix: note motor start amps and either size for peak or add soft-start / dedicated circuit.
- Missing accessory costs. Problem: mounting brackets, terminal blocks, busbars, cable glands, fasteners, and conduit add up. Fix: list every mounting and connector with a small per-item cost; group them as a single 'mounting and connectors' line in your budget.
- Underestimating labour and troubleshooting time. Problem: complex wiring through panels, testing, and rework often take much longer than installation. Fix: add a realistic testing and rework buffer (2–6 hours per major subsystem) or budget a short pro inspection.
Before you start: one short rule
If a component or run forces you to step up to a thicker cable, new busbars, or an upgraded alternator input, pause and re-price the whole subsystem — not just the single part.
A copyable checklist
- Finalize component list with model numbers
- Calculate steady and start currents for each circuit
- Choose fuse and wire gauge using 125% rule for continuous loads
- Itemize mounting, connectors, and conduit
- Estimate DIY hours vs pro hours and multiply by hourly values
- Add 15–30% contingency depending on system complexity
Quick tip
Tip: Label as you go. Label both ends of every run and keep a single diagram revision so troubleshooting later is fast and cheaper than guessing.
Takeaway
Run an electrical plan audit early to turn assumptions into numbers and avoid expensive surprises once parts are ordered or walls go up.
Next steps
Use the checklist above to convert your electrical plan into costs and honest labour estimates. Start by cleaning your component list and calculating currents; that alone will resolve many surprises.